Autonic brief is to ensure uninterrupted availability of power through use of renewable solutions at locations where grid power supply interruption is too high thereby necessitating need for consistent power supply during the periods of interruptions.
The objective is to utilize non-conventional sources of energy like Wind Solar Hybrid or Solar Hybrid by offering environmental friendly Wind / Solar Power plants to generate green power.
|